Damage & Repairs

Why a schedule of condition matters

A schedule of condition does not prevent damage, but it can make later questions about damage much easier to resolve.
Clear, practical guidanceThis article is written for adjoining owners. For advice about your own notice, award or neighbour’s works, speak to Coburns Party Wall.

Its main purpose is evidence

The record shows the visible condition of relevant parts of the adjoining property before work starts.

It protects both owners

The record can show whether a visible crack was present before work began. A later change is evidence to investigate, but does not, by itself, prove that the neighbour’s work caused it.

It is not a statutory entitlement in itself

A condition record is a widely used practical step rather than a separate legal right created by the Act.

Quality matters

The record should be clear enough that later comparison is meaningful: good photographs, accurate location descriptions and a sensible extent of inspection.

Key takeaway

The schedule does not strengthen the building; it strengthens the evidence.